Summer 2010

Sound Whisperers * Master Plasterers * Allstream Centre

cover
Published: Friday, May 07 2010

Sound Whisperers

A new sound rating from NRC-IRC goes beyond the standard STC ratings.

Modular Building Trends

Demand for modular structures is growing, and creators of design and assembly are scrambling to keep up.

Suspended Ceilings During a Seismic Event

The majority of repair costs used to come from non-structural components that failed during a seismic event.

Project: Allstream Centre in Toronto

One of Canada's greenest and most energy efficient conference centres to date opened in October 2009.

Project: EIFS in Mississauga

Lido Wall Systems recently completed a 90,000-square-foot EIFS contract for a 37-storey condo called Chicago Mississauga. Like other highrises that Lido has worked on, the tower presented its own set of challenges.

Financial Advice

Industry News (see left for more)

Inside Track

It's the Law

New Media

Product News (see right for more)

Technical Update